Some Maintenance Countermeasures for Sewage Treatment Equipment Blowers-Company updates-Ningbo evergreen environmental technology co. LTD
Keywords:Waste gas treatment Dust removal equipment Bag-type strainer Water rotary dedusting equipment Smoke management

Contact

Office Address: 703, Building 1, Miao Huan Power Town, Qingfeng Road, Jiangbei High-tech Zone, Ningbo City, Zhejiang Province
Production Address: No. 3 Zhuhai Road, Chengdong Industrial Park, Xiangshan County, Ningbo City, Zhejiang Province
Sales Department:+86-574-87792453
+86 13081928795
+86 18257419819
Purchasing Department:+86-574-87210884
Administration Department:+86-574-87211844
Fax:0574-87211844
E-mail:nbxyhb@sina.com
QQ:1565081426

Some Maintenance Countermeasures for Sewage Treatment Equipment Blowers

Release time:2026-01-07  Click:22

1. During the operation of the blower of the sewage treatment equipment, the main parameters such as water temperature, steam pressure, exhaust air volume, air pressure, external temperature, current, working voltage, etc. of the centrifugal fan and motor should be regularly inspected, and the record form should be filled out. When the abnormal phenomenon cannot be cleared, it should be shut down according to the operation procedure.

2. It is forbidden to touch the gas pipeline during the operation of the blower. When overhauling the gas pipeline, it should be carried out after the heat pipe is dissipated and cooled.

3. The blower and cooling water system software should take effective measures when the power is suddenly turned off or a common failure occurs. Domestic sewage treatment equipment

4. The muffler material of the air shower system and the adjustment equipment of the guide vane should be regularly maintained. When there is erosion or embrittlement, it should be repaired or replaced immediately.

5. Adjusting the air consumption of the blower should be based on the oxygen demand of the microbial reflection pool.

6. It is forbidden to reverse the drum centrifugal impeller of the sewage treatment equipment.

7. When everything is in normal operation, the working pressure of the ventilating air duct of the blower of the sewage treatment equipment cannot exceed the working pressure value of the design concept. After the operation is terminated, the intake and exhaust shut-off valves or adjustment valves should be closed. The cooling water blower that has been stopped for a long time should be emptied of the remaining water in the cooling water system software.

Contact us

703, Building 1, Miao Huan Power Town, Qingfeng Road, Jiangbei High-tech Zone, Ningbo City, Zhejiang Province
Production Address: No. 3 Zhuhai Road, Chengdong Industrial Park, Xiangshan County, Ningbo City, Zhejiang Province
Sales Department:+86-574-87792453
+86 13081928795
+86 18257419819
Purchasing department: +86-574-87210884

Administration department: 
+86-574-872118444
Fax: 0574-87211844
E-mail:nbxyhb@sina.com
Complaints and suggestions:
+86-18057401903

Follow us

Responsive image
Top
1565081426
+86-574-872118444